Construction Layout & Staking

Construction layout — also called construction staking — converts the approved design into stakes, hubs, and marks in the field: the reference points the contractor actually builds to. Crews set building corners, offsets, grades, and utility and paving alignments from the engineer's plans, and return to re-stake as the work progresses.

Construction layout turns the engineer's drawing into stakes, hubs, lath, and paint marks in the dirt — what the crew on the machine actually sees and builds to.

When you may need this

  • Starting site work or vertical construction and need building corners staked
  • Setting grades, utilities, or paving
  • Re-staking after grading or weather has disturbed the original layout

What's included

  • Field staking of building, grade, or improvement locations per the approved plans
  • Hubs, stakes, and reference points as appropriate to the work

Not sure this is the survey you need?

Layout comes before construction — we set the stakes the contractor builds to. A foundation survey comes after the pour and verifies where the structure actually landed. Most new builds use both, with a formboard check just before concrete. See Foundation Survey →

Our process

  1. 1
    Plans and control

    We review the construction drawings and establish project control referenced to the site benchmark.

  2. 2
    Building corners

    Building corners, offset hubs, and reference stakes are set with cut/fill information where needed.

  3. 3
    Utilities and paving

    Storm structures, water and sewer mains, curb returns, and pavement edges are staked per the plans.

  4. 4
    Re-stakes

    When grading or weather disturbs the original layout, the crew comes back and re-stakes.

Related survey types

  • Building layout
  • Rough stake / hub and tack
  • Stake and grade
  • Re-stake / re-hub
  • Utility and paving layout

Central Florida

We stake for residential builders in Seminole and Volusia, commercial GCs in Orange and Brevard, and site contractors across all nine counties. Lath, hubs, paint, and pin flags — whatever the contractor's grade crew wants to see.

In the field

Site contractor, Orlando

Full site layout for a 6-acre commercial pad — building corners, parking, drainage, and utilities staked over three mobilizations.

Custom builder, Mount Dora

Building layout with offset hubs and elevation cut sheets for the framing crew.

Subdivision GC, Deltona

Lot-by-lot building layout across an active phase, batched twice a week.

What you receive

Field layout on the ground (stakes, hubs, paint, lath), plus a cut sheet for the contractor and a layout drawing for the project record when requested.

Why Choose Efird Surveying Group

Efird Surveying Group is a Central Florida land surveying firm based in DeLand, with more than 20,000 completed surveys across Volusia, Lake, Marion, Flagler, St. Johns, Putnam, Seminole, Brevard, and Orange Counties. Our field crews coordinate with homeowners, builders, lenders, engineers, and municipalities to deliver friendly, fast, reliable, and accurate work. Every drawing is produced in AutoCAD and can be delivered by email, PDF, or printed copy.

Every survey is delivered signed and sealed by a Florida licensed Professional Surveyor and Mapper (P.S.M.). Licensing & credentials →

Timing & scheduling

Current scheduling

We are currently booked out roughly 6–8 weeks before our crews reach many project sites, working with four field crews. This reflects our current workload and is not a permanent guarantee. Contact us for the most current scheduling on your specific project.

Expected project duration

The fastest expected completion is approximately 30 days after all required supporting construction files are received and reviewed. Required supporting files may include PDFs and DWG/CAD files. Construction sequence, revisions, site readiness, access, and contractor coordination may extend the schedule. We do not promise immediate completion.

What affects timing

Records research · Legal-description complexity · County or agency response times · Weather · Vegetation · Access restrictions · Property size · Terrain · Current workload · Number of available crews · Incomplete or revised supporting files · Project complexity · Unexpected field conditions

What determines your quote

Pricing varies substantially based on the project, property, requested survey type, legal and records research, parcel size, site access, vegetation, terrain, complexity, deadlines, required deliverables, and other project-specific conditions. The best way to receive accurate pricing is to request a project-specific written quote.

  • Survey type and required deliverables
  • Parcel size and shape
  • Site access and terrain
  • Vegetation and field conditions
  • Records and legal-description research
  • Deadlines and coordination
Request an Estimate

Frequently asked questions

Do you re-stake if grading disturbs the original layout?

Yes — re-stakes and re-hubs are a normal part of construction layout work and can be scheduled as the project progresses.

What determines the scope of construction staking?

The approved plans do: the number of points to set, whether the stakes need grade (cut/fill) information, and how many mobilizations the construction sequence requires. Layout is commonly scheduled in phases — clearing, building corners, utilities, paving — as the site progresses.

Ready for your survey?