Formboard Survey
A formboard survey is performed once the slab forms are set, before concrete is poured, so any issues with location or setbacks can be corrected without breaking concrete.
A formboard survey catches a mis-set form before the concrete truck shows up — it's a few hundred dollars of survey that prevents tens of thousands of dollars of demolition.
When you may need this
- Forms are set and the slab is scheduled for pour
- Builder or lender requires confirmation of building location before pour
What's included
- Field location of the formboards relative to the property lines and setbacks
- Signed and sealed formboard survey drawing
Our process
- 1Forms set, pour scheduled
Builder calls us once the slab forms are set and the pour date is confirmed.
- 2Rapid field check
Crew measures the form perimeter to the property lines and setbacks the same day or the next morning.
- 3Pre-pour report
If everything is good, a signed and sealed formboard drawing is issued; if not, the builder gets a verbal heads-up before pour.
Related survey types
- Single-family formboard survey
- Multi-unit formboard survey
Central Florida
Tight infill lots in Sanford, Lake Mary, Winter Park, and Daytona Beach see most of our formboard work — when 5-foot side setbacks are the rule, getting the forms right before concrete is the whole game.
In the field
Formboard caught a corner three inches inside the setback line; forms adjusted before the next-morning pour.
Daily formboard runs across an active subdivision phase, batched by pour day.
Single-lot formboard delivered for a custom home on a tight cul-de-sac lot.
What you receive
Signed and sealed formboard survey drawing, plus an immediate verbal call if anything is out of tolerance so it gets fixed before concrete.
Why Choose Efird Surveying Group
Efird Surveying Group is a Central Florida land surveying firm based in DeLand, with more than 20,000 completed surveys across Volusia, Lake, Marion, Flagler, St. Johns, Putnam, Seminole, Brevard, and Orange Counties. Our field crews coordinate with homeowners, builders, lenders, engineers, and municipalities to deliver friendly, fast, reliable, and accurate work. Every drawing is produced in AutoCAD and can be delivered by email, PDF, or printed copy.
Every survey is delivered signed and sealed by a Florida licensed Professional Surveyor and Mapper (P.S.M.). Licensing & credentials →
Timing & scheduling
Current scheduling
We are currently booked out roughly 6–8 weeks before our crews reach many project sites, working with four field crews. This reflects our current workload and is not a permanent guarantee. Contact us for the most current scheduling on your specific project.
Expected project duration
The fastest expected completion is approximately 30 days after all required supporting construction files are received and reviewed. Required supporting files may include PDFs and DWG/CAD files. Construction sequence, revisions, site readiness, access, and contractor coordination may extend the schedule. We do not promise immediate completion.
What affects timing
Records research · Legal-description complexity · County or agency response times · Weather · Vegetation · Access restrictions · Property size · Terrain · Current workload · Number of available crews · Incomplete or revised supporting files · Project complexity · Unexpected field conditions
What determines your quote
Pricing varies substantially based on the project, property, requested survey type, legal and records research, parcel size, site access, vegetation, terrain, complexity, deadlines, required deliverables, and other project-specific conditions. The best way to receive accurate pricing is to request a project-specific written quote.
- Survey type and required deliverables
- Parcel size and shape
- Site access and terrain
- Vegetation and field conditions
- Records and legal-description research
- Deadlines and coordination
Frequently asked questions
What is the difference between a formboard and foundation survey?
A formboard survey is performed before the slab is poured to verify form location. A foundation survey is performed after the foundation is in place to verify its as-built position.
Related services
Foundation Survey
A foundation survey is performed after a foundation has been placed to verify the structure is located correctly on the lot, within setbacks, and consistent with the approved site plan.
Construction Layout & Staking
Construction layout — also called construction staking — converts the approved design into stakes, hubs, and marks in the field: the reference points the contractor actually builds to. Crews set building corners, offsets, grades, and utility and paving alignments from the engineer's plans, and return to re-stake as the work progresses.
Final / As-Built Survey
A final or as-built survey documents what was actually built — the location of the structure, drainage features, utilities, and other improvements once construction is complete. Building departments use it to close out the permit, lenders and title companies use it to close on new construction, and engineers use it to certify site work. The drawing is signed and sealed by a Florida licensed P.S.M.
Ready for your survey?
Contact us today for a free estimate. Call our DeLand office or send an estimate request and we'll get right back to you.